Infrastructural Projects

Pipe Rack-3 project – Connection of Oil Storage Terminals to new matrix manifold of Port of Fujairah

Civil Work : In-house
Structural Steel : In-house and Subcontracted
Road Works : All works in-house, except Asphalt works
Project Location : Al Quirriah, Fujairah
Client :Govt. of Fujairah
Consultant : MUC Engineering Consultancy
Project Cost : AED 5.60 Mln
Completed in : In 2008

The Pipe Rack-3 Project was constructed for the port of Fujairah and connects the Oil Storage Terminals located at FOIZ to the Matrix Manifold of the Port of Fujairah. The project involved construction of RCC foundations and Framed Steel Structure (weighing around 5000 tons of fabricated Steel frames & loops starting from FOIZ wall to the new Matrix Manifold of the Port.

Spread over a length of around 2 Kms, the project also involved an intensive study of underground services within the area / length of the project and effective coordination with various Government & other authorities involved in lieu of the intricate underground services like Sewage Disposal Network, Etisalat Network Cables, FEWA Electric & Water distribution Networks, Gas Pipe Line, Defense Cables etc. Diverting and protection of the underground services, has also been undertaken at various places.

Overview

Cable Rack project
Pipe Rack-3 project – Connection of Oil Storage Terminals to new matrix manifold of Port of Fujairah
Qurriah Underpass.
Storm Water drainage Project – Fujairah to Bidiyah Town.
.