Aluminium Projects

G+2 Airline Office Building, Fujairah International Airport, Fujairah

Aluminium Work : In-house designed & manufactured Façade, Doors & Windows
Fabrication : In-house
Installation : In-house
Project Location : Fujairah Airport, Fujairah
Client : Fujairah Intl. Airport
Main Contractor : FNCT
Consultant : DRU Architects Engineers, Interior Design
Project Cost : AED 1.1 Mln
Completed in : 2013

This new Airline Office for Fujairah International Airport spreads over 3800 Sqm and the complete front Façade is a fully glazed and Aluminium clad, curved Façade, (concave). There are too many combinations if 4 sided structural glazed Curtain Wall to cladding. To curve wall and suspension wall (an intricate design). The Scope of works involves 4 sided Structural glazed with U-insets which is also called Mechanical fixed glass system and is an equivalent to Alu-K system, Schuco System or other International Curtain Walling System, Windows, Doors, Canopy, SUS Columns Cladding Automatic Door, all doors with master key system and aluminium cladding.

Overview

.